Retire completed Redview migration scripts #270

Merged
nimmo merged 1 commit from chore/remove-redview-cutover-scripts into main 2026-10-06 16:11:06 +01:00
Owner

The one-off Lyra V1-to-V2 production migration completed on 2026-10-02, and the persistent 2.4.0 encoder/worker cutover completed on 2026-10-06. Remove the obsolete production preparation helper and its paired rehearsal so routine updates do not retain executable migration instructions. Their historical versions remain available in Git.

Update README to record completed migration/cutover and link the operational evidence. The private RC3 cleanup helper remains outside this repository for recovery; Redview's reusable migration/verification utilities and acceptance tools remain unchanged. No service configuration, media, database or credential files change.

Validation: deleted filenames have no remaining tracked references; shellcheck passes for remaining shell scripts; actionlint passes with the existing Nova runner/Forgejo URL exceptions; git diff --check passes. Existing live deployment is unaffected. Refs #268.

The one-off Lyra V1-to-V2 production migration completed on 2026-10-02, and the persistent 2.4.0 encoder/worker cutover completed on 2026-10-06. Remove the obsolete production preparation helper and its paired rehearsal so routine updates do not retain executable migration instructions. Their historical versions remain available in Git. Update README to record completed migration/cutover and link the operational evidence. The private RC3 cleanup helper remains outside this repository for recovery; Redview's reusable migration/verification utilities and acceptance tools remain unchanged. No service configuration, media, database or credential files change. Validation: deleted filenames have no remaining tracked references; shellcheck passes for remaining shell scripts; actionlint passes with the existing Nova runner/Forgejo URL exceptions; git diff --check passes. Existing live deployment is unaffected. Refs #268.
Retire completed Redview production migration scripts
All checks were successful
AI pull-request review / review (pull_request) Successful in 1m7s
e3c833e3c8
Author
Owner

Automated code review

Reviewed commit: e3c833e3c81bef794344a71246b30ff6bd46d513

Verdict: Ready to merge

No blocking or important findings were retained, and deterministic checks passed. Suggestions remain advisory.

Overall assessment

The pull request removes obsolete production migration scripts (redview-v2-production-prepare.sh and test-redview-v2-production-prepare.py) and updates README.md to reflect that the V1-to-V2 migration and subsequent cutover are complete. The changes are consistent with the stated objective of retiring one-off operational tools after successful completion.

Blocking findings

None.

Important findings

None.

Suggestions

None.

Tests and validation

  • No configured deterministic checks.

Questions

  • The README update states the initial migration completed on 2026-10-02, but the cutover occurred on 2026-10-06. Are there any residual configuration files or systemd units referencing the 'V1' or 'RC3' trial state that should be verified as fully removed from the live system?

Review limitations

  • I cannot verify the current state of the production database on Lyra to confirm the migration was successful beyond the documentation claims.
  • I cannot execute the deleted scripts to validate their logic, though they are being removed.
  • I cannot check for other references to the deleted script filenames in the repository or external systems.

Diff coverage

  • README.md: reviewed — included in a context-limited batch
  • scripts/redview-v2-production-prepare.sh: reviewed — included in a context-limited batch
  • scripts/test-redview-v2-production-prepare.py: reviewed — included in a context-limited batch
Review metadata
  • Reviewer: forgejo-ai-review v1
  • Model: qwen3.6:35b-a3b-q8_0
  • Guidance loaded: .forgejo/ai-review.md, .forgejo/ai-review.yml, AGENTS.md, docs/auto-update-remediation.md, docs/nova-remote-builder.md, README.md
  • Commits considered: 1
  • Previous automated review: none found
  • Findings: 0
<!-- forgejo-ai-review:v1 --> ## Automated code review Reviewed commit: `e3c833e3c81bef794344a71246b30ff6bd46d513` ## Verdict: Ready to merge No blocking or important findings were retained, and deterministic checks passed. Suggestions remain advisory. ### Overall assessment The pull request removes obsolete production migration scripts (`redview-v2-production-prepare.sh` and `test-redview-v2-production-prepare.py`) and updates `README.md` to reflect that the V1-to-V2 migration and subsequent cutover are complete. The changes are consistent with the stated objective of retiring one-off operational tools after successful completion. ### Blocking findings None. ### Important findings None. ### Suggestions None. ### Tests and validation - No configured deterministic checks. ### Questions - The README update states the initial migration completed on 2026-10-02, but the cutover occurred on 2026-10-06. Are there any residual configuration files or systemd units referencing the 'V1' or 'RC3' trial state that should be verified as fully removed from the live system? ### Review limitations - I cannot verify the current state of the production database on Lyra to confirm the migration was successful beyond the documentation claims. - I cannot execute the deleted scripts to validate their logic, though they are being removed. - I cannot check for other references to the deleted script filenames in the repository or external systems. ### Diff coverage - `README.md`: **reviewed** — included in a context-limited batch - `scripts/redview-v2-production-prepare.sh`: **reviewed** — included in a context-limited batch - `scripts/test-redview-v2-production-prepare.py`: **reviewed** — included in a context-limited batch <details><summary>Review metadata</summary> - Reviewer: forgejo-ai-review v1 - Model: qwen3.6:35b-a3b-q8_0 - Guidance loaded: .forgejo/ai-review.md, .forgejo/ai-review.yml, AGENTS.md, docs/auto-update-remediation.md, docs/nova-remote-builder.md, README.md - Commits considered: 1 - Previous automated review: none found - Findings: 0 </details>
nimmo merged commit e24ab44d03 into main 2026-10-06 16:11:06 +01:00
nimmo deleted branch chore/remove-redview-cutover-scripts 2026-10-06 16:11:07 +01:00
Sign in to join this conversation.
No reviewers
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
nimmo/nixos-config!270
No description provided.